Computer Factory

(some assembly required)

Computer component factory optimized for 200 plastic / min (300 m3 /min of crude oil) input. Just need to add the 5 side external lifts and connect a manufacturer on top!

This blueprint manage to cram 2 smelter, 2 foundry, 14 constructor and 5 assembler with minimal clipping and esthetical belt layout.

Require Cast Screw and Copper Alloy Ingot alternate recipes.

Input (at the bottom)

  • 87.069 iron ore / min
  • 84.483 copper ore / min
  • 200 plastic / min

Output (at the top) all the component required to output 3.448 computer / min with a manufacturer overclocked to 137.931%.

Instruction on how to overclock cable line constructors are displayed on second and third floor for optimal output if you have power shard to spare (30 vs 31.034 cable / min).

  • Created on Feb 27, 2024, 10:54:34 PM
  • Last updated on Feb 27, 2024, 10:57:53 PM