Concrete factory in the Rocky Desert designed to aesthetically resemble a cement plant. Consists of:
- Concrete Constructors x 88 (352MW, concrete 1320pm)
- Wet Concrete Refineries x 6 (180MW concrete 480pm)
- Water Extractors x 5 (100MW)
- Pump Mk1 + Mk2 (12MW)
- Miner Mk 3 x 14 (420MW)
- Truck Station x 2
- Train Station x 8
- Freight train x 1 (for limestone)
Limestone is delivered via rail from across the Rocky Desert zone, taking up 14 limestone deposits. At full capacity, this megaprint can produce up to 1800pm concrete, for delivery via either truck or rail. While not the maximum amount of concrete possible (that would require using only wet concrete refineries), this quantity is suitable for producing Heavy Modular Frames at 60pm as an example.
Power
Powered from the rail system. Detailed figures above, plus power for any transport. The plant itself is divided into 3 switch groups (each group produces 600pm concrete).
Version History
- v1.0: Initial Version
Modded Content
Enlarged pieces used for roads, walls and decreative elements
- Öğe Sayısı 3.148
- Koordinatlar -228.863 / -103.928
- Yalnızca orijinal konuma yapıştırın Yes
- Kategoriler Architecture Complete factory Exterior decorations Tracks system Modded UPDATE 8
- Created on 27 Mar 2024 11:55:40
- Taşıma Bandı v.5 262
- Güç Hattı 261
- Temel 1m 232
- Taşıyıcı Asansör v.1 224
- Yarım 1m Temel 207
- Taşıyıcı Asansör v.5 164
- Taşıma Bandı Desteği 125
- Büyük Beton Sütun 101
- Basit Duvar 4m 91
- Ãœretici 88
- Demiryolu 88
- Taşıma Bandı Birleştirici 80
- EÄŸik Duvar 8m 79
- Duvar Prizi v.1 75
- Taşıma Bandı Ayırıcı 66
- Dış Köşe Eklentisi 4m 48
- Endüstriyel Depolama Konteyneri 48
- Taşıyıcı Asansör v.3 48
- Çerçeve Temel 41
- Temel 4m 35
- Eğik İçbükey Duvar 8m 32
- Taşıma Bandı v.3 32
- Yük Platformu 31
- Blok Sinyali 30
- Taşıma Bandı v.4 27
- Temel 1m 25
- Yarım 4m Temel 20
- Yürüme Platformu Merdivenleri 20
- Temel 1m 18
- Çatı Düz 18
- Demiryolu Makası Kumandası 18
- Temel 1m 17
- Elektrik DireÄŸi v.2 16
- Madenci v.3 15
- Tavan Lambası 14
- Boru Hattı v.2 14
- Elektrik DireÄŸi v.1 14
- Boru Hattı v.1 13
- Çift Rampa 4m 12
- Çatı 1m 12
- Sokak Lambası 12
- Yürüme Platformu Köşesi 12
- Taşıyıcı Asansör v.4 12
- Çatı 2m 10
- Portre Tabelası 10
- Taşıma Bandı v.2 9
- Tren Ä°stasyonu 9
- Dış Köşe Eklentisi 4m 8
- Boru Hattı Desteği 8
- Temel 2m 7
- Çatı 4m 7
- Küçük Beton Sütun 7
- Taşıma Asansörü Zemin Deliği 7
- Çapraz Boru Hattı Bağlantı Noktası 7
- Yarım 2m Temel 6
- Büyük Çerçeve Sütun 6
- Rampa Duvar 2m 6
- Rampa Duvar 4m 6
- Basit Duvar 1m 6
- Rafineri 6
- Taşıyıcı Asansör v.2 6
- İstiflenebilir Taşıma Bandı Desteği 6
- Rota Sinyali 6
- Lamba Kontrol Paneli 5
- Su Çıkarıcı 5
- Boru Hattı Zemin Deliği 5
- Pencereli Duvar 4
- Eğik İçbükey Duvar 8m 4
- Rampa Duvar 1m 4
- FICSMAS Kar Makinesi 4
- Boru Hattı v.1 (Göstergesiz) 4
- Boyanmış Kiriş 3
- Metal KiriÅŸ 3
- Orta Kapılı Duvar 3
- Yan Kapılı Duvar 3
- Yürüme Platformu T Kavşağı 3
- Güç Şalteri 3
- Çift Rampa 8m 2
- Ters Üst Köşe 1m 2
- Çift Rampa 2m 2
- Projektör Işık Duvar Aparatı 2
- Küçük Çerçeve Sütun 2
- Pervazlı Cam 2
- 3 Taşıma Bantlı Duvar 2
- Otomatik Kapı 2
- Rampa Duvar 8m 2
- Merdiven 2
- Düz Yürüme Platformu 2
- Kamyon Ä°stasyonu 2
- Boru Hattı Duvar Deliği 2
- Çift Rampa 4m 1
- 1 Taşıma Bantlı Duvar 1
- 2 Taşıma Bantlı Duvar 1
- Endüstriyel Korkuluk 1
- Akıllı Ayırıcı 1
- Boru Hattı Duvar Aparatı 1
- Boru Hattı Pompası v.2 1
- Boru Hattı Pompası v.1 1
- Boru Hattı v.2 (Göstergesiz) 1
- BoÅŸ Platform 1
- Elektrik DireÄŸi v.3 1
- Beton 6.636
- Kablo 2.247
- Çelik Boru 2.052
- Çelik Kiriş 1.525
- Hızlıtel 1.026
- Demir Plaka 969
- Tel 614
- Alclad Alüminyum Levha 590
- Demir Çubuk 578
- Gerçek Kar 400
- Bakır Levha 348
- Güçlendirilmiş Demir Levha 314
- Ağır Modüler Çerçeve 228
- Motor 217
- Lehimlenmiş Modüler Çerçeve 150
- Bilgisayar 140
- Kaplanmış Endüstriyel Kiriş 119
- Kuvars Kristali 100
- Mil 94
- Süperbilgisayar 75
- Devre Kartı 60
- Turbo Motor 45
- Taşınabilir Madenci 45
- Baston Åžeker 40
- Modüler Çerçeve 30
- Plastik 23
- YZ Sınırlayıcı 19
- Silika 12
- FICSMAS Dekoru 8
- Kauçuk 3
- Yüksek Hızlı Bağlayıcı 2
-
-XAZU- the earthdweller - 9 Nis 2024 16:34:20
As an aesthetic piece, it's amazing! Very creative use of enlarged objects for a credible irl cement factory look.
As a producing factory, it's relatively meh, but not enough for me to knock off a star. There's a lot of things I would have done differently, but that's not saying they are done 'wrong'. For example, using a push pull train line for moving the limestone such a short distance feels excessive and a large use of space that could have been reduced by using (miles of) conveyor belts.
Within the facility itself, there's not a lot of machine eye candy. Most of the constructors are just crammed in a box with some moderate clipping. But this is offset with the exterior aesthetics (which imo is what warrants a high rating for this creation! good job!)
With close to 6000 limestone per minute being mined out, I would have expected a higher final product output, but it makes sense that the bulk of it is processed with hidden constructors for aesthetic reasons in this application. Constructors floating in the air would be points taken from the 5-star rating if they had not been hidden, and exposed refineries give me that eye-candy of moving machinery.
There's a lot of irl details sprinkled throughout, giving the place a realistic feel. I found the train station import manifold particularly intricate. Overall, I like it, but given it's construction and layout it would be tricky to implement into an existing world unless the whole rail system + miners are dismantled and replaced with something compatible with one's existing infrastructure.
I recommend more details to be added to description. Things I would consider crucial to call out would be total power consumption, ppm in/out, labeled power switch functions, etc. Also, more information on what your direction for this build was would be great. Something to give others an idea of what to expect before they import the print.
Thank you for sharing it with us!
-
xbb1024 - 8 Nis 2024 22:46:47
Hi everyone. I've checked every belt, pipe and powerline, everything in the megaprint seems connected and functioning. Please leave some feedback if you find any issues