Project P.I.O.N.E.E.R.
Welcome to the Planetary Initiative Organization Nexus/ Engineered Economical Rocket, or Project P.I.O.N.E.E.R. I took a bit of inspiration from the Star Carrier book series by Ian Douglas to make a spaceship themed central hub; utilizing the mushroom cap design used for near light speed travel radiation shielding for the bulk of the factory.
The whole base is more than just a storage hub. There is a hypertube system and bridge that can quickly move a pioneer from the grassy canyon to the upper plateau. There are also 4 P.P.C's (Pioneer Projectile Cannons) utilizing B.E.L.T. loading (Biological Equipment Loading Transjector) capable of sending pioneer nearly anywhere on the map with jet pack/parachute creativity. There is also a prototyping holodeck off of the armory
There is also a full manufacturing setup for processing biomass, slugs, packaged fuel, and ammo/nobelisk production. Production utilizes parts from storage, along with piping in the needed oil and water. You will need to create drone ports to fly in 4 resources:
Coal 120 PPM Sulfur 120 PPM Bauxite: 120 PPM Uranium: 20 PPM
But the best part is the Rapid Part Delivery System. I have a drone port mapped to every part type along with 2 additional drones for use as ammo and supply drops. These drone ports are also connected to the sorting bus; so you can have the drones bring back unneeded parts, wood, leaves, ect. for storage and processing. It takes around 2 minutes at most for any parts to deliver by drone once you have it mapped to a field drone port.
---I've received a few complaints about the storage not showing any parts, which is true only when you first start loading parts. When parts are filtered, they go through a priority load order. First priority (where applicable) is to load the production machines for ammo production, second would be to fill up the drones and drone ports, then they will start filling up the storage bins. Please keep this in mind that it will take time for parts to show in the storage bins, but they will likely show up for drone delivery almost right away.
***For obvious reasons, do not feed WIP items into the sorting bus, the entire thing will end up jamming. I do have filters set up just before the sinks on the sorting line to pull unsinkable items into a storage container, as long as the items can be selected in programmable splitters
Please drop me a line at Yokmosho on Discord with any comments or bugs/issues found
Updates/fixes: 12-3: connection issue before final sinks fixed 12-8: sped up uranium belt to nuke nobelisk production so uranium doesn't back up in the drone port storage and lead to massive amounts of radiation in the base. Also rebuilt the hypertubbe entrance and landing zone at the bottom of the rocket to prevent the "relativistic death cannon" when using the hypertube from the top. 12-11: reversed fill order on packagers to prevent water overflow from taking all containers and stalling. Also replaced a missing merger near the end of the main feed bus that led to an eventual overflow
- Recuento de objetos 39.618
- Coordenadas -25 / 85.038
- Pegar sólo en la ubicación original Yes
- Categorías Architecture Complete factory Interior decorations Exterior decorations Pipes system UPDATE 8
-
Puntuación
2 / 5
- Versión de compilación 269.772
- Autor Yokmosho
- Descargar (431x) Descargar
- Tamaño del archivo 2,13 MB
- Creado el 3/12/2023 16:12:18
- Última actualización el 12/12/2023 1:21:33
- Pared Básica de 4m 5.084
- Pared Básica de 4m 3.055
- Cimientos 1m 2.937
- Cimiento de Armazón 1.579
- Cinta transportadora v.5 1.472
- Viga de Metal 1.267
- Pared Inclinada de 4m 1.166
- Cartel de Etiqueta de 4m 1.070
- Pared Básica de 4m 823
- Conector de Viga 813
- Cartel Vertical 792
- Cartelera Pequeña 696
- Pared Inclinada de 8m 670
- Línea eléctrica 665
- Cimientos 1m 645
- Suelo de Armazón 579
- Cinta Elevadora Mk.5 529
- Cartel Cuadrado de 1m 474
- Cartel Cuadrado de 0,5m 463
- Cartelera Grande 461
- Pared de Armazón 459
- Cimientos 1m 457
- Viga Pintada 448
- Esquina Inclinada de Pared de 8m 446
- Pared Inclinada de 8m 441
- Pared Inclinada de 4m 403
- Ventana Enmarcada Hexagonal 393
- Agujero de Suelo para Cinta Elevadora 332
- Unión de cintas transportadoras 322
- Cartel Horizontal 315
- Rampa Doble de 2m 300
- Cimientos 1m 293
- Cimiento Medio 1m 281
- Tomacorrientes de Pared Mk.1 278
- Cinta transportadora Mk.1 276
- Tubería Mk.1 267
- Poste de cinta transportadora 242
- Pilar de Metal Pequeño 229
- Pared Básica de 1m 221
- Tejado de 1m 216
- Pared Básica de 1m 210
- Cinta Elevadora Mk.1 207
- Pared Básica de 1m 203
- Pared cóncava inclinada de 4m 196
- Pared de Rampa de 8m 188
- Divisor inteligente 179
- Tubería Mk.1 (sin indicador) 161
- Pilar de Metal Grande 153
- Rampa Doble de 2m 152
- Pared de Rampa inv. de 8m 148
- Esquina Inclinada de Pared de 4m 134
- Contenedor de almacenamiento industrial 129
- Cimientos 1m 118
- Tejado plano 114
- Montura de techo para transportador 111
- Barandilla Moderna 105
- Soporte de Pared para Hipertubo 98
- Pilar Grande de Hormigón 96
- Hipertubo 93
- Pared de Rampa de 4m 88
- Tejado de 4m 86
- Esquina Inclinada de Pared de 4m 86
- Soporte de Tubería 85
- Pilar de Hormigón Pequeño 84
- Pared Inclinada de 4m 82
- Luz de techo 79
- Montura de pared para transportador 71
- Regulador de Fluidos 70
- Entrada de Hipertubo 69
- Pared de Rampa inv. de 4m 68
- Divisor de Cinta transportadora 67
- Soporte de Pared para Tubería 64
- Portón Automatizado 60
- Cinta Transportadora Mk.3 58
- Agujero de Suelo para Tubería 58
- Cruce de unión de tuberías 58
- Cimiento Medio 1m 45
- Tejado de 2m 44
- Pared Inclinada de 8m 44
- Rampa de 4m 43
- Foco de pared 43
- Pared de Rampa inv. de 1m 42
- Estación de drones 42
- Tejado plano 41
- Rampa de Pasadizo 40
- Cinta Elevadora Mk.2 40
- Cartel Cuadrado de 2m 37
- Cimiento Medio 1m 33
- Agujero de Pared para Tubería 33
- Cimiento Medio 1m 30
- Cinta Transportadora Mk.2 29
- Tejado plano 28
- Ventana reforzada 28
- Divisor Programable 28
- Poste transportador apilable 25
- Soporte de Hipertubo 25
- Tejado de 2m 24
- Conector Doble de Viga 23
- Esquina Superior de Rampa de 1m 22
- Tejado de 1m 22
- Contenedor de almacenamiento 22
- Pared para Cinta Transportadora x2 20
- Ventana Enmarcada Completa 20
- Agujero de suelo para Hipertubo 20
- Pasadizo Recto 19
- Rampa Doble de 4m 18
- Pared de Rampa de 1m 18
- Esquina de Pasadizo 18
- Cinta Elevadora Mk.3 18
- Refinería 17
- Cinta Transportadora Mk.4 17
- Tejado de 1m 16
- Tejado de 2m 16
- Envasadora 16
- Constructor 15
- Rampa Doble de 8m 14
- Pared de Rampa inv. de 2m 14
- Pared de Rampa inv. de 1m 14
- Soporte de Tubería Apilable 14
- Agujero de Pared para Hipertubo 14
- Doble Tomacorriente de Pared Mk.1 14
- Cartel de Etiqueta de 2m 13
- Ensambladora 13
- Esquinero interior 1m 12
- Pared de Rampa de 1m 12
- Soporte de pared para cinta transportadora x3 11
- Cimiento de Armazón de Cristal 10
- Cimiento Medio 1m 10
- Panel de control de iluminación 10
- Pared de Rampa de 8m 10
- Rampa de 1m 9
- Cimientos 2m 9
- Pared con Agujero de Portón 9
- Pared de Rampa de 4m 9
- Poste de Energía Mk.1 9
- Rampa inv. de 1m 8
- Bomba de Tubería Mk.2 7
- Torre de Energía 7
- Tejado de 4m 6
- Pared para Cinta Transportadora x1 6
- Pared para Cinta Transportadora x2 6
- Pared con Puerta en el Centro 5
- Pared para Cinta Transportadora x1 5
- Pared de Rampa de 4m 5
- Esquina Inferior de Rampa de 2m 4
- Esquina Exterior de tejado de 2m 4
- Pared de Rampa de 2m 4
- Escaleras de Pasadizo 4
- Triturador AWESOME 4
- Plataforma de carga 4
- Rampa inv. de 2m 3
- Pared de Rampa de 2m 3
- Pared de Rampa inv. de 4m 3
- Mezcladora 3
- Productor 3
- Poste de Energía Mk.3 3
- Poste de Energía Mk.2 3
- Cimientos 4m 2
- Rampa de 4m 2
- Esquina Inferior de Rampa de 4m 2
- Esquina Superior de Rampa de 4m 2
- Rampa de 2m 2
- Tejado de 4m 2
- Esquina Exterior de tejado de 4m 2
- Soporte de Viga 2
- Pared de Rampa inv. de 4m 2
- Pared cóncava inclinada de 4m 2
- Pared con Agujero de Portón 2
- Pared con Puerta Lateral 2
- Barandilla Industrial 2
- Cartel de Etiqueta de 3m 2
- Extractor de Pozo de Recursos 2
- Extractor de agua 2
- Horno 2
- Cinta Elevadora Mk.4 2
- Esquina Superior inv. de 1m 1
- Esquina Exterior de tejado de 4m 1
- Pared con Puerta Lateral 1
- Pared con Agujero de Portón 1
- Esquina Inclinada de Pared de 4m 1
- Soporte de pared para cinta transportadora x3 1
- Pared de Rampa inv. de 1m 1
- Pared con Puerta Lateral 1
- Pared con Puerta en el Centro 1
- Escalera 1
- Estación de fabricación 1
- Taller de equipamiento 1
- Diseñador de Planos 1
- Presurizador de Pozo de Recursos 1
- Plataforma de salto 1
- Base de aterrizaje gelatinosa 1
- Bomba de tubería Mk.1 1
- Estación de tren 1
- Señal de Bloque 1
- Interruptor de alimentación 1
- Hormigón 63.202
- Viga de acero 17.979
- Cristal de cuarzo 17.010
- Lámina de Cobre 14.070
- Plancha de Hierro 9.536
- Viga industrial reforzada 8.251
- Turboalambre 5.207
- Lámina de hierro reforzada 5.114
- Lámina de aluminio revestido 4.630
- Tubería de acero 3.884
- Barra de hierro 3.318
- Oscilador de cristal 3.001
- Alambre 2.871
- Carcasa de Aluminio 2.250
- Cable 1.599
- Estructura modular pesada 956
- Sílice 882
- Conector de alta velocidad 849
- Rotor 712
- Unidad de control por radio 435
- Plástico 386
- Estructura modular 365
- Motor 357
- Goma 219
- Limitador de IA 210
- Biomasa 200
- Supercomputadora 28
- Ordenador 16
- Circuito impreso 2
-
Yokmosho - 2/4/2024 2:09:15
Darth Bludgeon, I tested the megaprint out to look for any glitching on the smart splitters moving parts to their respective storage bins, all were behaving normally. When parts are filtered, they go through a priority load order. First priority (where applicable) is to load the production machines for ammo production, second would be to fill up the drones and drone ports, then they will start filling up the storage bins.
-
Darth Bludgeon - 25/3/2024 12:19:07
Really pretty build, lots of neat stuff... if it worked. Doesn't, for me; got supplies halfway hooked up and realized everything I was loading from the train station was going straight to the sinks. The peripheral chains seemed to work (bio-fuel, slug processing, color cartridges); coal distribution worked (brought that in by drone), batteries filled all the drone ports (but none appeared in the containers) - in fact, nothing appeared in the container area regardless of what or where it was loaded. Nice design, though.
-
-XAZU- the earthdweller - 10/12/2023 2:24:43
aaahhh!! i just found the blueprint designer area! so sick!! this is definitely a "i beat the game and don't wanna build the perfect base myself" kinda print. i like it! your architectural sense is leaps and bounds ahead of mine! lol good job!
-
-XAZU- the earthdweller - 10/12/2023 2:21:38
wow! what a project! i liked the shooting range!
im still touring it and im sure ive missed a couple of spots but this place is HUGE! theres so much space! very straight forward storage solution tho! and the drone hive idea is power hungry but effective i bet!
ive been peeking around the logistics and it looks stout! 4 lines of incoming items at mk5 speeds!
-
Yokmosho - 9/12/2023 3:41:40
Spacepup, I'm humbled by your use of Project P.I.O.N.E.E.R in a YouTube video. I can't say that I've ever expected any of my creations to spawn a video project.
-
spacepup - 7/12/2023 0:52:59
i made a short video on this if you wanna check it out! ( https://www.youtube.com/watch?v=L8ygO8Cy938 )