Nuclear swamp stinger power station reactor component. 250,000 MW (part 1 of 2)
---Update note Recent update on 10-2 to move the nitric acid production to the new node location after a recent update move the nitrogen well located west of blue crater by about 100m
The first few survey missions Ficsit sent to Massage-2 (A-B)b noticed a strange power anomaly in the swamp. The first pioneer drop pod sent to the swamp lost it's video feed just after landing; the last image showed a massive uranium infused stinger capable of self nuclear reactions. Ficsit immediately dropped several more Pioneer teams to the swamp with the goal of capturing and harnessing this meta-stinger to power the upcoming space elevator project. Though all 96 pioneers died during there efforts, they managed to build an unrivaled power plant for the next pioneer's arrival.
This massive build project with a 100 reactor power plant is actually 1 piece of the entire nuclear power site. It has the reactors, entire water feed setup, sulfuric and nitric acid production, concrete production, drone relays for bringing in uranium, fuel rod manufacturers, and every part of chain for making uranium cells and recycling nuclear waste. There is actually a companion megaprint titled "Nuclear Swamp Stinger Production Facilities" https://satisfactory-calculator.com/en/megaprints/index/details/id/1467/name/Nuclear+Swamp+Stinger+Production+Facilities that mostly merges with this reactor build. This companion megaprint handles building the non-radioactive components needed for fuel and recycling production, only needing a manual connection of 3 mk5 belts and 2 power cables to activate. It also contains a swamp spanning rail and vehicle bridge.
This power plant segment was designed to run stand alone for those that do not want to add the production factory segment, but needs the following:
15,0000 MW either from a power grid or from stored battery power to kick start all production or pumps before the reactors kick in. -Encased beams = 65 PPM -pressure cubes = 10PPM -electromagnetic control rods = 105 PPM -Silica = 670 PPM -aluminum casing = 180 PPM -batteries = 60 PPM All other resources already produce themselves. The belt connection points have images on signs showing what items need to connect to which belts. Also allow about 5 minutes from supplying outside power to connect needed parts to allow fluid and concrete buildup to start
This is a lot more of an exercise in balancing a massive production chain than beautiful builds, though it definitely has a creative layout and design I did have considerably more intricacy and build design (twisted pipes, more spread out production per pod, hypertube network from the control room to each pod), but the issue was that the blueprint was weighing in at 5.8 MB and had to undergo significant trimming to meet the upload limit. Original construction on the reactor site was done in update 5 before swamp layout changes. Most minor intrusions from the update 6 changes have been worked around, but there is a "perma-spore-tree" that is going through the central platform that couldn't be avoided or worked around. Be gentle in the ratings, there are a lot of "floating platforms and exposed belts in the structure along with some overclocked factory machines to reduce blueprint items; I had limited wiggle room to play with to meet the upload limit.
I can be reached at Yokmosho on Discord with any issues encountered, comments, ect.
- Recuento de objetos 59.009
- Coordenadas 118.516 / -3.967
- Pegar sólo en la ubicación original Yes
- Categorías Architecture Complete factory Interior decorations Exterior decorations Pipes system UPDATE 7 UPDATE 8
-
Puntuación
3 / 5
- Versión de compilación 249.836
- Autor Yokmosho
- Descargar (736x) Descargar
- Tamaño del archivo 3,97 MB
- Creado el 28/8/2023 1:16:14
- Última actualización el 3/10/2023 2:46:01
- Pared Básica de 4m 9.171
- Cimientos 1m 5.698
- Ventana Enmarcada Hexagonal 4.656
- Pilar de Metal Pequeño 3.990
- Tejado de 1m 3.165
- Pared de Armazón 2.820
- Pared Básica de 4m 2.560
- Cimientos 1m 2.031
- Tubería Mk.2 1.894
- Cinta transportadora v.5 1.621
- Rampa Doble de 4m 1.386
- Cimiento de Armazón 1.335
- Línea eléctrica 1.290
- Tejado plano 1.195
- Soporte de Tubería Apilable 972
- Pared Básica de 4m 971
- Cimientos 1m 893
- Tejado de 1m 800
- Cinta Elevadora Mk.1 676
- Agujero de Suelo para Cinta Elevadora 606
- Tubería Mk.1 601
- Cinta Elevadora Mk.5 588
- Tejado plano 495
- Cruce de unión de tuberías 426
- Poste de cinta transportadora 405
- Esquina Superior inv. de 1m 400
- Cinta transportadora Mk.1 383
- Rampa Doble de 8m 370
- Rampa Doble de 4m 370
- Divisor de Cinta transportadora 318
- Rampa inv. de 2m 316
- Agujero de Suelo para Tubería 283
- Unión de cintas transportadoras 273
- Viga Pintada 260
- Conector de Viga 240
- Tomacorrientes de Pared Mk.1 226
- Extractor de agua 219
- Cimientos 2m 206
- Soporte de Tubería 192
- Cartel Vertical 180
- Cartelera Pequeña 176
- Tejado plano 170
- Poste de Energía Mk.1 155
- Rampa de Armazón 148
- Poste transportador apilable 135
- Pared de Rampa de 8m 118
- Divisor inteligente 117
- Pared Inclinada de 8m 115
- Rampa de Armazón Invertida 110
- Pared Inclinada de 8m 110
- Pared de Rampa inv. de 8m 107
- Bomba de Tubería Mk.2 106
- Torre con focos 100
- Central nuclear 100
- Mezcladora 81
- Productor 50
- Soporte de Pared para Tubería 47
- Rampa de 2m 46
- Tejado plano 45
- Cinta Transportadora Mk.2 41
- Viga de Metal 40
- Refinería 40
- Poste de Energía Mk.3 38
- Constructor 35
- Montura de techo para transportador 33
- Rampa de 2m 29
- Montura de pared para transportador 29
- Tejado de 4m 25
- Esquina Superior inv. de 1m 21
- Rampa Doble de 8m 20
- Cimientos 4m 20
- Pared Inclinada de 4m 20
- Ventana Enmarcada Completa 19
- Acelerador de Partículas 18
- Pared para Cinta Transportadora x1 17
- Estación de drones 16
- Envasadora 14
- Poste de Energía Mk.2 14
- Ensambladora 12
- Doble Tomacorriente de Pared Mk.1 12
- Rampa de 1m 11
- Panel de control de iluminación 11
- Rampa Doble de 8m 10
- Rampa de 4m 10
- Rampa de 4m 10
- Rampa inv. de 2m 10
- Cimientos 2m 10
- Rampa inv. de 1m 10
- Esquina Superior inv. de 1m 10
- Cimientos 1m 10
- Pared Inclinada de 4m 10
- Soporte de pared para cinta transportadora x3 10
- Pared Básica de 1m 10
- Tubería Mk.1 (sin indicador) 10
- Tejado de 2m 9
- Cantera Mk.3 9
- Cimiento Medio 1m 8
- Pilar de Hormigón Pequeño 8
- Extractor de Pozo de Recursos 7
- Cartel Cuadrado de 0,5m 6
- Portón Automatizado 4
- Pared de Rampa de 1m 4
- Contenedor de almacenamiento 4
- Divisor Programable 4
- Cartel de Etiqueta de 2m 3
- Triturador AWESOME 3
- Tubería Mk.2 (sin indicador) 3
- Rampa Doble de 2m 2
- Soporte de Pilar Pequeño 2
- Pared de Rampa de 2m 2
- Pared para Cinta Transportadora x2 2
- Escalera 2
- Rampa inv. de 4m 1
- Cimiento Medio 1m 1
- Tejado de 1m 1
- Luz de techo 1
- Pared de Rampa de 4m 1
- Cartel de Etiqueta de 4m 1
- Taladro Mk.2 1
- Presurizador de Pozo de Recursos 1
- Generador geotérmico 1
- Acumulador de Energía 1
- Contenedor de almacenamiento industrial 1
- Cinta Elevadora Mk.4 1
- Hormigón 142.523
- Viga de acero 23.931
- Cable 15.026
- Plancha de Hierro 13.883
- Lámina de aluminio revestido 13.597
- Lámina de Cobre 12.859
- Sílice 9.350
- Barra de hierro 5.676
- Plástico 5.455
- Carcasa de Aluminio 4.850
- Estructura modular pesada 4.150
- Lámina de hierro reforzada 3.451
- Turboalambre 2.786
- Motor 2.536
- Rotor 2.472
- Viga industrial reforzada 2.214
- Cristal de cuarzo 1.816
- Barra de control electromagnética 1.800
- Tubería de acero 1.793
- Alambre 1.781
- Unidad de control por radio 1.015
- Sistema de Refrigeración 900
- Supercomputadora 737
- Estructura Modular Fundida 450
- Conector de alta velocidad 439
- Goma 384
- Motor turbo 207
- Oscilador de cristal 176
- Limitador de IA 150
- Taladro portátil 29
- Estructura modular 20
- Estátor 5
-
Yokmosho - 2/1/2024 15:55:52
I worked quite a bit with GrOOvER regarding the backing up of waste and overall cascade failure. My testing did not reproduce the same result, but the server GrOOvER had the powerplant running on had a Smart splitter and a Programmable splitter located in a pretty critical area spontaneously fail to function. Deleting them and replacing them fixed the issue. This was in the production half of the megaprint, not the powerplant half. I'll have an updated print uploaded with these splitters deleted and readded
-
gOOvER - 27/12/2023 7:03:53
I like the design and spent 12 hours yesterday trying to bring order to the quaos. Unfortunately this is not possible. Everything is also full of nuclear waste and all the belts are blocked.
Super design, but implementation is misserable. Therefore only 2 stars
-
Yokmosho - 14/9/2023 17:05:29
DoeBIG:
I am fully aware of the belt and pipe spaghetti mess mainly limited to the main area of the “wet factory” and leading into the transfer room for the integration between the 2 halves of the print. The original build was much cleaner and more streamlined, but I ran into several issues:
- The entire factory was build on production lines filling and going to the next phase as it was built. Running it from a completely empty state was a disaster and had to have a lot of reformatting with overflows and backflows to stabilize. I attempted to do some tidying up after everything was working, but that hit the biggest and next issue polish
- Upload size: I’m not exaggerating in saying that had to do a massive amount of cuts to fit the megaprint upload limits. I had to remove walls, have less power connectors and string cables all over the place, ect. to trim every object I could to lower size. Several of those “spaghetti knots” of cables would have required extra walls, ceiling and wall belt supports, and lots of short belt segments to straighten out; I just didn’t have the file size overhead to play with and had to leave an uncomfortable number of long floating belts.. If a nice clean setup is all your looking for, I have a project in the works that is a main storage and delivery base, along with an ammo factory. It has a much smaller file size and is leaving a lot more room for.
-
DoeBIG - 8/9/2023 22:02:22
Interested building, amazing bridge and then you found awful interior. Spaghetti belts and pipes. Same with cables...what is wrong with you mate, why you did not build at least pipes and belts correctly? Wanted to try power plants, but after integrating and looking inside amazing building, i was disgusted and deleted it So i cant confirm functionality.
-
Yokmosho - 4/9/2023 4:51:04
I found the issue regarding a few smart spitters not behaving correctly and causing a slow water buildup on the recycling line. I've tested past 8 hours with no issues found so far. Please redownload the updated megaprint to correct the fault.
-
Andreas61 - 2/9/2023 12:45:53
Does not work. It starts as described, then after 6-7 hours of operation it stops and that's it.